| B01. Boiler steel structure, duct & Preassure parts erection, view from North |
| B01. Boiler preassure parts item for lifting position |
| B01. Boiler preassure parts item assembly at site |
| B01. Boiler steel structure, duct and preassure parts erection, view from South |
| B01. Boiler Rear side Steel structure and duct erection, view from South |
| B01. Boiler steel structure and preassure parts erection, view from West |
| B01. Boiler rear side steel structure and duct erection, view from North |
| B06. Bunker bay area Mill foundation completion |
| B06. Boiler Bunker bay area Steel structure and Silo duct erection, and chimney, view from West |
| B06. Bunker bay area steel structure and silo duct erection, view from West |
| B07. Fabric filter steel structure and hopper erection, view from West |
| B17. Auxiliary boiler foundation |
| B17. Flue gas duct area duct assembly |
| B17. Flue gas duct area steel structure erection |
| G18. Reserve feed water storage foundation, & E50. Cooling water culvert Turbine hall to Aeration Basin |
| B33. Unit electrical building ground floor HVAC work |
| B33. Unit electrical building 1st floor HVAC work |
| B33. Unit electrical building transformer area, and 3rd floor column erection and G10. emergency diesel generator foundation |
| B33. Unit electrical building general view from South |
| B35. Boiler electrical building plastering and painting work, view from East |
| B35. Boiler electrical building plastering work, view from North |
| B35. Boiler electrical building ground floor plastering work |
| B35. Boiler electrical building 1st floor HVAC work |
| B63. Turbine hall West concrete pedestal |
| B63. Turbine Hall 0' level slab concrete reform work |
| B68. Auxiliary Transformer building |
| B68. Main transformer building |
| C03. Fuel Oil Pump station |
| C05. Crusher house 1st floor column erection |
| C71. Electrical building near Crusher house |
| C72. Electrical building near bunker bay area |
| D01. Ash stroage area |
| E05. Cooling water piping sleeper foundation, piling extension |
| F06. cable way foundation |
| G05. Demineralized water production equipment erection |
| G25. Operational industrial water pump station foundation, North side |
| G25. Operation industrial water pump station foundation, and column erection South side |
| G28. Oil & Fire fighting water recover pit |
| L05. Absorber shell side wall rebar installation |
| L13. Aeration basin foundation work |