Thursday, 20 March 2014

19.03.2014

B01. Boiler steel structure, duct & Preassure parts erection,
view from North

B01. Boiler preassure parts item for lifting position

B01. Boiler preassure parts item assembly at site

B01. Boiler steel structure, duct and preassure parts erection,
view from South

B01. Boiler Rear side Steel structure and duct erection,
view from South


B01. Boiler steel structure and preassure parts erection,
view from West


B01. Boiler rear side steel structure and duct erection,
view from North


B06. Bunker bay area Mill foundation completion

B06. Boiler Bunker bay area Steel structure and
Silo duct erection, and chimney, view from West


B06. Bunker bay area steel structure and
silo duct erection, view from West



B07. Fabric filter steel structure and hopper erection,
view from West

B17. Auxiliary boiler foundation

B17. Flue gas duct area duct assembly


B17. Flue gas duct area steel structure erection

G18. Reserve feed water storage foundation, &
E50. Cooling water culvert Turbine hall to Aeration Basin 

B33. Unit electrical building ground floor HVAC work


B33. Unit electrical building 1st floor HVAC work

B33. Unit electrical building transformer area,
and 3rd floor column erection and
G10. emergency diesel generator foundation



B33. Unit electrical building general view from South

B35. Boiler electrical building plastering
and painting work, view from East

B35. Boiler electrical building plastering work,
view from North

B35. Boiler electrical building ground floor plastering work

B35. Boiler electrical building 1st floor HVAC work

B63. Turbine hall West concrete pedestal

B63. Turbine Hall 0' level slab concrete reform work


B68. Auxiliary Transformer building

B68. Main transformer building

C03. Fuel Oil Pump station

C05. Crusher house 1st floor column erection



C71. Electrical building near Crusher house

C72. Electrical building near bunker bay area

D01. Ash stroage area

E05. Cooling water piping sleeper foundation, piling extension

F06. cable way foundation

G05. Demineralized water production equipment erection

G25. Operational industrial water pump station foundation,
North side

G25. Operation industrial water pump station foundation,
and column erection South side

G28. Oil & Fire fighting water recover pit

L05. Absorber shell side wall rebar installation



L13. Aeration basin foundation work

No comments:

Post a Comment

Note: only a member of this blog may post a comment.