B01. Boiler Pressure parts assembly at site |
B01. Boiler pressure parts item for lifting position |
B01. Boiler pressure parts item preparation for lift |
B01. Boiler pressure parts for lifting position |
B01. Pressure parts lifting position |
B06. Bunker bay area steel structure & silo duct erection, view from south |
B01. Boiler steel structure, duct and pressure parts erection, view from South |
B01. Boiler Steel structure rear side |
B01. Boiler steel structure, preassure parts and duct erection, B07. Fabric filter steel structure & hopper erection, view from West |
B01. Boiler steel structure, Duct & Preassure parts erection B07. Fabric filter hopper erection view from West |
B07. Fabric filter hopper erection , view from North |
B06. Bunker bay area steel structure and Silo Duct erection, and Chimeny, view from West |
B06. Bunker bay area Mill foundation completion |
B07. Fabric filter Hopper casing assembly (B17 area) |
B07. Fabric filter steel structure and Hopper erection, view from South |
B07. Fabric filter hopper erection, view from North |
B17. Steel structure erection |
B33. Boiler electrical building plastering work, view from North |
B33. Unit electrical building ground floor- HVAC work |
B33. Unit electrical building 1st floor completion of painting |
B33. Unit electrical building transformer area |
B33. Unit electrical building 3rd floor column erection |
B33. Boiler Electrical building, plastering work, view from East |
B35. Boiler electrical building Transformer area, view from North |
B35. Boiler electrical building ground floor, painting and HVAC work |
B35. Boiler electrical building 1st floor painting and HVAC work |
B63. Turbine hall West side |
B63. Turbine hall view, North |
B63. Turbine hall pedestal concrete work, view from North |
B68. Main transformer building concrete repair work |
B68. Auxiliary transformer building |
B68. Main transformer building ,view from East |
C03. Fuel oil pump station foundation work |
C05. Crusher house 1st floor column erection |
C30. Fuel oil unloading area |
C40. Light fuel oil storage retention work |
C71. Electrical building near Crusher house |
C72. Electrical building near Bunker bay area |
D01. Ash storage foundation concrete |
E05. Cooling water piping sleeper fooundation piling extension |
F06. Cable way foundation |
G05, Demineralized water production equipment erection |
G05. Equipment erection |
G06. Demineralized water effluent foundation |
G10. Emergency diesel generator foundation |
G16. Industrial waste water treatment |
G17. Auxiliary Boiler foundation work |
G18. Reserve feed water storage |
G25. Operational industrial water pump station foundation work |
G25. Operation industrial water pump station foundation and column erection, view from South |
L05. Absorber shell wall concrete work |
L13. Aeration basine foundation work |
L13. Aeration basin foundation work |
L24. FGD Duct foundation work |