B01. Boiler steel structure erection west side |
B01. Boiler pressure parts assembly at site |
B01. Boiler pressure parts assembly at site |
B06. Bunker bay area steel structure and Silo Duct erection |
B01. Boiler steel structure, Duct & Preassure parts erection, View from South |
B01. Boiler preassure parts header on position for lift |
B01. Boiler steel structure erection west side, view from South |
B01. Boiler steel structure, Duct & Preassure parts erection B07. Fabric filter steel structure and hopper erection, View from West |
B01. Boiler steel structure & duct erection B07. Fabric filter and Hopper erection view from West |
B06. Bunker bay area steel structure and Silo duct erection |
B06. Bunker bay area Mill foundation completion |
B07. Fabric filter Casing assembly |
B07. Farbric filter hopper erection, View from North |
B17/L10 area - Farbic filter casing assembly |
B07. Fabric filter steel structure and hopper installation |
B33. Unit Electrical building, 3rd floor slab concrete work and side plastering work |
B33. Unit electrical building Ground floor HVAC work |
B33. Unit electrical building 1st floor painting completion |
B33. Unit electrical building Transformer area, General view from East |
B33. Unit electrical building, view from South |
B35. Boiler Electrical building plastering, view from East |
B35. Boiler electrical building plastering work, view from North |
B35. Boiler electrical building ground floor painting work |
B35. Boiler electrical building 1st floor HVAC DUCT and fire fighting work |
B63. Turbine hall West side, side wall rebar installation, view from South |
B63. Turbine hall South End, Side wall rebar installation |
B68. Auxiliary transformer building side wall rebar installation |
B68. Main transformer building concrete repair work |
C03. Fuel Oil pump station |
C05. Crusher house 1st floor slab concreete |
C30. Fuel Oil unloading area |
C40. Light fuel oil retention work |
C71. Electrical building near Crusher house |
C72. Electrical building near Bunker bay |
D01. Ash Storage Foundation concrete |
F06. Cable way from Transformer to Switchyard |
G05. Demineralized water production equipment erection |
G06. Demineralized water effluents |
G10. Emergency Diesel Generator |
G17. Auxiliary Boiler foundation |
G25. Operational industrial water pump station, foundation concrete, view from North |
G25. Operational Industrial water pump station foundation column erection, view from South |
G28. Oil & fire fighting water recovery pit |
L13. Aeration basin foundation work |
No comments:
Post a Comment
Note: only a member of this blog may post a comment.