Aerial Photographs Overal Plant General view from East |
F01. Switch Yard - Gandry erection, view from East |
E05. Cooling water piping sleeper foundation area and Intake |
Power block view from West. C05. Crusher house, C72. electrical building, B02. chimeny, L05. Absorber area, D01. Ash storage. B07. fabric filter area hopper erection B35. Boiler electrical building. L13 Aeration basin |
Power Block general view from West. B01. Boiler steel structure, Duct and Pressure parts erection |
Coal Handly System conveyor foundation and steel structure erection |
Power block- D01. Ash storage structure erection. B07. Fabric filter hopper erectoin. B35. Boiler electrical building B17. Flue gas duct assembly and steel structure erection |
C04. Coal yard South side. Stack reclaimer foundation work, |
Coal handling system transfer tower TT17 & 16, C73. Electrical building, E50. Cooling water culvert |
C04. Coal yard South side. steel structure for coal conveyor |
C04. Coal yard North area. TT20 & 21 steel structure |
Power plant overall veiw from North |
E02. Cooling water pump station and Intake, and electrical building |
E02. Cooling water pump station |