Monday, 1 June 2015

01.06.2015

Boiler view from north
Boiler PA/FA fans north side
Boiler north side
Boiler view from south
Boiler PA/FA fans south side
Boiler view from north
Fabric filter view from north
Fabric filter view from south
Fabric filter view from north
Fabric filter view from west
ID fan
Fly ash silo
MCW outlet header at Turbine hall
MCW outlet header at Turbine hall
MCW outlet header at Turbine hall
Turbine hall view from east
Turbine hall Level +16.0m
Turbine hall Level +16.0m
Turbine hall Lube oil room
Turbine hall Level +16.0m
Turbine hall Level +16.0m
Turbine hall Level +16.0m - Generator
Turbine hall Level +16.0m
Turbine hall Level +16.0m
Turbine hall Level +16.0m
Turbine hall Level +16.0m
Turbine hall Lube oil room
Turbine hall Level +16.0m
Cooling water piping Section 1D
Cooling water piping Section 1D
Cooling water piping Section 1D
Cooling water piping
Cooling water piping
Cooling water piping Section 1D
Cooling water piping welding in progress
Cooling water piping near Turbine hall backfilling
Cooling water piping near Turbine hall
MCW piping at road diversion
MCW piping at road diversion
HV cable piperack
Turbine hall view from south
MCW piping backfilling
Cooling water piping outlet from Turbine hall backfilled
Unit Electrical building 3rd floor
Unit Electrical building 3rd floor Engineering room
Unit Electrical building 3rd floor control room
Unit Electrical building 3rd floor simulation room
Light fuel oil tank
Waste water treatment plant
Boiler south side area
Boiler acid waste pit
FGD aeration basin
FGD aeration basin
FGD aeration basin pumps
FGD aeration basin GRP piping
FGD aeration basin
FGD aeration basin
FGD aeration basin
FGD aeration basin
FGD aeration basin
FGD GRP piping
FGD view from south
FGD view from west