Sunday, 28 June 2015

29.06.2015

Fabric filter view from north
Ash silos
PA/FA fans north side
Cooling water header at Turbine hall
Turbine hall ground level
Turbine hall ground level
Turbine hall ground level
Turbine hall ground level
Piping insulation
Lube oil room at Turbine Hall
Lube oil room at Turbine Hall
Turbine hall Level +16.0m
Turbine hall Level +16.0m
Turbine hall Level +16.0m
Turbine hall Level +16.0m
Turbine hall Level +16.0m
Turbine hall Level +16.0m
Lube oil room at Turbine Hall
Turbine hall Level +16.0m
Turbine hall Level +16.0m
Turbine hall Level +16.0m
Turbine hall Level +16.0m
Turbine hall piping insulation
B89a Gas storage
Turbine hall view from east
Industrial waste water building - lightings installation
Condensate make-up pumps
Waste water treatment plant electrical building
Waste water treatment plant
Waste water treatment plant - filter press
Aeration basin
FGD view from south
FGD view from south
FGD absorber
ID Fan
Fabric filter
PA/FA fan south
Waste water treatment plant
Waste water treatment plant
FGD aeration basin
Boiler electrical building
Waste water treatment plant
Piping insulation at Boiler
Lightings installation at Boiler
FGD view from east
FGD aeration basin
FGD aeration basin
Lightings installation at Boiler
Light fuel oil tank
Boiler acid waste pit
Light fuel oil tank
MCW piping to CWPH
Boiler tripper floor
Small power & lightings panel at Boiler
Boiler PA/FA fans north side
Turbine hall view from east
Electrical terminations at Boiler Level +16.0m
Electrical terminations at Boiler Level +16.0m
Turbine hall Level +16.0m
Turbine hall Level +16.0m
Turbine hall - Lube oil room
Transformer area
MCW piping to CWPH
Industrial water pump station
Hazardous storage building
Unit Electrical Building
Unit Electrical Building rooftop
Unit electrical building - Central control room
Unit electrical building - third floor
Unit electrical building - third floor
Fabric filter compressed air building

No comments:

Post a Comment

Note: only a member of this blog may post a comment.