Boiler view from north |
Boiler view from north |
Boiler PA/FA fans north side |
Boiler SSC view from north |
Boiler PA/FA fans south side |
Boiler view from south |
Boiler view from north |
Fabric filter view from north |
Fabric filter view from south |
Fabric filter view from south |
MCW header outlet at Turbine hall |
MCW header outlet at Turbine hall |
Steam blow piping under preparation |
Steam blow piping under preparation |
Power block view from east |
Turbine hall view from east |
FGD view from south |
FGD view from south |
FGD absorber |
FGD absorber |
FGD duct view from north |
Cooling water piping Section 1D |
Cooling water piping near Turbine hall |
Cooling water piping Section 1D |
Cooling water piping |
Cooling water piping near Turbine hall |
Main transformer area |
Auxiliary boiler |
Pumps near main condensate tank |
MCW piping outfall to aeration basin backfilled |
Waste water treatment plant |
FGD aeration basin |
FGD aeration basin |
FGD aeration basin |
FF compressed air building |
Stacker reclaimers |
No comments:
Post a Comment
Note: only a member of this blog may post a comment.