Boiler PA/FA fans north side |
Boiler SSC north side |
Fabric filter |
Turbine hall |
Turbine hall view from east |
MCW header outlet at Turbine hall |
MCW header outlet at Turbine hall |
MCW header outlet at Turbine hall |
MCW header outlet at Turbine hall |
Steam blow piping at Turbine hall |
Steam blow piping at Turbine hall |
Steam blow piping at Turbine hall |
Steam blow piping at Turbine hall |
Steam blow piping at Turbine hall |
Steam blow piping at Turbine hall |
Turbine hall Level -5.2m |
Piping insulation at Turbine hall |
Turbine hall piping |
Steam blow piping at Turbine hall Level +16.0m |
Steam blow piping at Turbine hall Level +16.0m |
Turbine hall Level +16.0m |
Steam blow piping at Turbine hall Level +16.0m |
Steam blow piping at Turbine hall Level +16.0m |
Steam blow piping at Turbine hall Level +16.0m |
Turbine hall Level +16.0m |
Steam blow piping at Turbine hall Level +16.0m |
Steam blow piping at Turbine hall Level +16.0m |
Turbine hall Level +16.0m |
Turbine hall Level +16.0m |
Turbine hall Level +16.0m |
Turbine hall Level +16.0m |
Turbine hall Level +16.0m |
Turbine hall Level +16.0m |
Turbine hall Level +16.0m |
Turbine hall Level +16.0m |
Turbine hall Level +16.0m |
Turbine hall Level +16.0m |
Turbine hall Level +16.0m |
Turbine hall Level +16.0m |
Turbine hall Level +16.0m |
Turbine hall Level +16.0m - Lube oil flushing in progress |
Turbine hall Level +16.0m |
Turbine hall Level +16.0m |
Turbine hall piping insulation |
Acid cleaning piping |
MCW piping at road diversion |
Cooling water piping at Turbine hall backfilled |
Cooling water piping at Turbine hall backfilled |
Cooling water piping at Turbine hall |
Cooling water piping at Turbine hall |
Cooling water piping at Turbine hall - Section 1D |
Cooling water piping |
Cooling water piping |
Cooling water piping |
Cable drums at centre of Unit Electrical Building and Turbine hall |