Boier FD/PA Fan erection - North side |
B89B Gas storage foundation |
Main cooling water Outlet piping |
Steam blow out piping erection |
Turbine hall ground level |
Turbine hall 0 meter |
Acid Pond |
Main cooling water piping |
Main cooling water piping back filling, Turbine hall and Section 1D area |
Turbine and generator -Over view |
Turbine and generator - over view |
Turbine Gnerator over view |
Lube oil room |
Waste water treatment plant and Aeration basin |
Aeration basin |
Auxiliary boiler building area |
Cable |
Under boiler - scrap conveyor system erection |
Boiler area view from North |
Fabric filter area insulation work |