Sunday, 28 June 2015

28.06.2015 - overall site photo


Power general view from North


Boiler area PA & FD fan erection

Fabric filter area


FD Fand and Duct erection - North side

Scrape Collecting system conveyor erection


Scrape collecting system conveyor erection view from South

B89B Gas storage foundation

Main cooling water outlete piping

Steam blow out pipe erection






Main cooling water piping - backfilled

Turbine hall general view from North


G02 - Tank erection finishing work

G07 - Tank erection


Turbine hall generqal view from East

Turbine hall East side - Main cooling water piping back filled

Cable pulling- Unit electrical building area


Vessels Insulation and cladding work

Vessels insulation and cladding work


Turbine hall



Turbine hall

Turbine hall


Turbine hall



Turbine hall

Turbine hall


Turbine hall


Turbine hall

Turbine hall


Turbine hall

Turbine hall

Turbine hall

Turbine hall



Waste water treatment area

FGD pumpstation and Aeration basine


Auxiliar boiler building and Lfo area

Acid pond

Water treatment area

Aeration basine


Industrial water pump station

Auxiliary building

PA and FD fan and duct erection - South side


Fabric filter area - insualtion work - South side

Waste water treatment equipment erection

FGD pumpstation area


FGD pumpstation


Aeration basin



FGD area


Boiler area general view from South



FGD area


Absorber area
  
GGH Rotor at site




GGH heavy equipment at site




ASH handling system - erection



Air compressor build electrical work

FGD Duct insulation and cladding work


Boiler area - General view from North