Power general view from North |
Boiler area PA & FD fan erection |
Fabric filter area |
FD Fand and Duct erection - North side |
Scrape Collecting system conveyor erection |
Scrape collecting system conveyor erection view from South |
B89B Gas storage foundation |
Main cooling water outlete piping |
Steam blow out pipe erection |
Main cooling water piping - backfilled |
Turbine hall general view from North |
G02 - Tank erection finishing work |
G07 - Tank erection |
Turbine hall generqal view from East |
Turbine hall East side - Main cooling water piping back filled |
Cable pulling- Unit electrical building area |
Vessels Insulation and cladding work |
Vessels insulation and cladding work |
Turbine hall |
Turbine hall |
Turbine hall |
Turbine hall |
Turbine hall |
Turbine hall |
Turbine hall |
Turbine hall |
Turbine hall |
Turbine hall |
Turbine hall |
Turbine hall |
Turbine hall |
Waste water treatment area |
FGD pumpstation and Aeration basine |
Auxiliar boiler building and Lfo area |
Acid pond |
Water treatment area |
Aeration basine |
Industrial water pump station |
Auxiliary building |
PA and FD fan and duct erection - South side |
Fabric filter area - insualtion work - South side |
Waste water treatment equipment erection |
FGD pumpstation area |
FGD pumpstation |
Aeration basin |
FGD area |
Boiler area general view from South |
FGD area |
Absorber area |
GGH Rotor at site |
GGH heavy equipment at site |
ASH handling system - erection |
Air compressor build electrical work |
FGD Duct insulation and cladding work |
Boiler area - General view from North |