MCW outlet header at Turbine hall |
MCW outlet header at Turbine hall |
Turbine hall steam blow piping at Level +0.0m |
Turbine hall steam blow piping at Level +0.0m |
Turbine hall steam blow piping at Level +0.0m |
Turbine hall steam blow piping at Level +0.0m |
Turbine hall steam blow piping at Level +0.0m |
Turbine hall steam blow piping at Level +0.0m |
Steam blow piping at Turbine hall |
Steam blow piping at Turbine hall |
Steam blow piping at Turbine hall |
Steam blow piping at Turbine hall |
Steam blow piping at Turbine hall |
Steam blow piping at Turbine hall |
Turbine hall |
Turbine hall |
Turbine hall |
Turbine hall |
Turbine hall |
Turbine hall steam blow piping at Level +16.0m |
Turbine hall steam blow piping at Level +16.0m |
Turbine hall at Level +16.0m |
Turbine hall Lube oil Room |
Turbine hall at Level +16.0m |
Boiler PA fan north side |
Boiler SSC north side |
Boiler PA/FA fan north side |
Boiler view from north |
Fabric filter |
Boiler acid waste pit |
MCW piping to CWPH |
Cooling water piping at Turbine hall backfilled |
Cooling water piping at Turbine hall Section 1D |
Cooling water piping at Turbine hall |
Cooling water piping at Turbine hall |
Cooling water piping at Turbine hall Section 1D |
Cooling water piping at Turbine hall Section 1D |
Cooling water piping at Turbine hall backfilled |
MCW piping to CWPH |
No comments:
Post a Comment
Note: only a member of this blog may post a comment.