Friday, 12 June 2015

11.06.2015

MCW outlet header at Turbine hall
MCW outlet header at Turbine hall
Turbine hall steam blow piping at Level +0.0m
Turbine hall steam blow piping at Level +0.0m
Turbine hall steam blow piping at Level +0.0m
Turbine hall steam blow piping at Level +0.0m
Turbine hall steam blow piping at Level +0.0m
Turbine hall steam blow piping at Level +0.0m
Steam blow piping at Turbine hall
Steam blow piping at Turbine hall
Steam blow piping at Turbine hall
Steam blow piping at Turbine hall
Steam blow piping at Turbine hall
Steam blow piping at Turbine hall
Turbine hall
Turbine hall
Turbine hall
Turbine hall
Turbine hall
Turbine hall steam blow piping at Level +16.0m
Turbine hall steam blow piping at Level +16.0m
Turbine hall at Level +16.0m
Turbine hall Lube oil Room
Turbine hall at Level +16.0m
Boiler PA fan north side
Boiler SSC north side
Boiler PA/FA fan north side
Boiler view from north
Fabric filter
Boiler acid waste pit
MCW piping to CWPH
Cooling water piping at Turbine hall backfilled
Cooling water piping at Turbine hall Section 1D
Cooling water piping at Turbine hall
Cooling water piping at Turbine hall
Cooling water piping at Turbine hall Section 1D
Cooling water piping at Turbine hall Section 1D
Cooling water piping at Turbine hall backfilled
MCW piping to CWPH

No comments:

Post a Comment

Note: only a member of this blog may post a comment.