| Boiler area general view from North |
| Fabric filter area - Insulation |
| Boiler area PA Fan and motor erection |
| FD & PA fan erection - Boiler North side |
| Submerged Scraper Conveyor System erection |
| B89B - Gas storage foundation work |
| Main Cooling water outlet piping |
| Outlet piping inspection - remaining work |
| Outlet piping inpsection - remaining work |
| Outlet piping inpsection - remaining work |
| Outlet piping inpsection - remaining work |
| Outlet piping inpsection - remaining work |
| Outlet piping inpsection & Manhole- remaining work |
| Outlet pipe checking missing activity - bolting and nut |
| Condenser area checking - missing activity bolting |
| Condenser area checking - missing item |
| Main cooling water piping - missing bolting |
| Steam blow out piping erection |
| Main cooling water piping back filling East Turbine area |
| Main cooling water piping Section 1D backfilling |
| Main cooling water piping - Section 1D backfilling |
| Removing piling |
| Turbine hall view from East |
| Turbine hall East side - backfilling main cooling water piping |
| Turbine hall - 16 m - Insulation |
| Turbine hall |
| Lube oil room |
| Turbine hall |
| Turbine hall |
| Turbine hall |
| Turbine hall |
| Turbine hall insulation work |
| Turbine hall insulation work |
| Turbine hall insulation work |
| Turbine hall insulation work |
| baby turbine area - insulation |
| Turbine hall |
| Turbine hall |
| Aeration basin |
| Aeration outfall |
| Boiler area insulation work |
| FGD area |
| Ash handling area & Fabric filter area |