Thursday, 18 June 2015

17.06.2015

Boiler area general view from North

Fabric filter area - Insulation

Boiler area PA Fan and motor erection

FD & PA fan erection - Boiler North side


Submerged Scraper Conveyor System erection

B89B - Gas storage foundation work

Main Cooling water outlet piping

Outlet piping inspection - remaining work

Outlet piping inpsection - remaining work

Outlet piping inpsection - remaining work

Outlet piping inpsection - remaining work

Outlet piping inpsection - remaining work

Outlet piping inpsection & Manhole- remaining work


Outlet pipe checking missing activity - bolting and  nut


Condenser area checking - missing activity bolting





Condenser area checking - missing item

Main cooling water piping - missing bolting

Steam blow out piping erection

Main cooling water piping  back filling East Turbine area

Main cooling water piping Section 1D backfilling


Main cooling water piping - Section 1D backfilling

Removing piling

Turbine hall view from East

Turbine hall East side - backfilling main cooling water piping


Turbine hall - 16 m - Insulation

Turbine hall

Lube oil room

Turbine hall

Turbine hall

Turbine hall

Turbine hall

Turbine hall insulation work

Turbine hall insulation work

Turbine hall insulation work

Turbine hall insulation work


baby turbine area - insulation

Turbine hall

Turbine hall


Aeration basin - Effluent pipe erection

Aeration basin

Aeration outfall

Boiler area insulation work

FGD area

Ash handling area  & Fabric filter area

No comments:

Post a Comment

Note: only a member of this blog may post a comment.