Wednesday 6 November 2013

06.11.2013



B01. Boiler steel Structure Tire 4 erection,
and Hot & Cool Duct erection
View from West

B01. Steel Structure Tier 4 & Duct erection
B06. Bunker bay steel structure &
Silo cone erection - Viewfrom South

B01. Steel Structure Tier 4 & Duct erection
B06. Bunker bay steel structure &
Silo cone erection - View from North


B06. Bunker Bay area steel structure &
Silo cone Erection, view from East

B02. Chimney Erection, vew from North



B07.  Fabric Filter pile cap preparation,
view from East

B33. Unit Electrical Building. 1st floor
slab concrete reform work, view from South

B33. Unit Electrical Building. 1st floor
slab concrete reform work, view from East

B35. Boiler Electrical Building

B63. Turbian Hall civil work,
excavation in progress



B68. Transformer Building side
wall concreting work, view from North

C05. Crusher House Foundation work

D01. Ash storage, Pile cap preparation

G06. Demineralized water plant
foundation concrete reform work

L10. Booster Fan Pedestal

L13. Aeration Basine area sheet piling
and excavation

C71. Electrical building near Crusher house,
piller concrete work in progress




Coal Handling Transfer Tower TT16 Steel
structure erection in progress








No comments:

Post a Comment

Note: only a member of this blog may post a comment.