Friday 7 February 2014

06.02.14



B01. Boiler area lifting equipment

B01. Boiler pressure parts erection,
view from Bottom

B06. Bunker bay area Mill foundation on going



B07. Hopper & casing assembly

B07. Fabric filter steel structure erection

B33. Unit electrical building
general view from South

B35. Boiler electrical work, plastering work

B06. Bunker bay steel structure
& Duct silo erection

B63. Turbine hall basement concrete work



B63. Turbine hall South end
steel rebar installation

B68. Auxiliary transform building
side wall rebar installation

C05. Crusher house column erection

C40. Light fuel oil storage retention work

C72. Electrical building bunker bay area

F06. Cable way foundation work

G16. Industrial waste water treatment Plant

G17. Auxiliary boiler foundation work

G18. Reserve feed water storage

G25. Operational industrial water pump station

L13. Aeration basin foundation work

F06. Cable Way foundation
F06. Cable way foundation