Tuesday 20 May 2014

16 May 2014 - Construction Progress Picture


B01 - Boiler South View


B01 - Boiler Pulverizer Base Installation Ongoing


B01 - Pressure Part Erection Ongoing

B01 - Pressure Part Erection Ongoing

TT24 - Steel Erection Ongoing

C72 - Coal Handling Electrical Bunker Civil Ongoing

B68 - Aux Transformer Pile Head and Excavation Ongoing

B68 - Aux Transformer Area

E05 - Main Cooling Water Piping, Sleeper Work Ongoing


E05 - Main Cooling Water Piping, Sleeper Work Ongoing


B68 - Transformer Gravelling Removing and Rail Installation Ongoing



F06 - HV Cable, Civil Work Ongoing


B68 - Transformer Gravelling Removing and Rail Installation Ongoing

ADV Module Assembly On Position


B64 - ST Foundation and Generator Foundation Block, Civil Ongoing


B63 -  Steam Turbine Building


B63 - Steam Turbine Building, Civil Work and Neck Installation Ongoing

B63 - Steam Turbine Building, Civil Work Ongoing

C40 - Light Fuel Oil Storage


C40 - Light Fuel Oil Storage North View

E50 - Main Cooling Water Culverts ST. Hall to Aeration Bassin

L13 - Aeration Bassin

L13 - Aeration Bassin

L43 - FGD Absorber Water Supply and Discharge Piping Area

L13 - Aeration Bassin


L13 - Aeration Bassin


B35 - Boiler Electrical building, Cable Tray Installation Ongoing

B35 - Boiler Electrical building, Cable Tray Installation Ongoing

B35 - Boiler Electrical building

B33 - Unit Electrical Building East View

B33 - Cable Tray Installation


B33 - Second Floor

G17 - Auxiliary Boiler, Rebar and RC work Ongoing


G17 - Auxiliary Boiler, Rebar and RC work Ongoing

G17 - Auxiliary Boiler Area

H03 - Pipe and Electrical Rack Area

C30 - Fuel Oil Unloading Area

C30 - Fuel Oil Unloading Area

F06 - HV Cable, Civil Work Ongoing

G25 - Indstrial Water Pumps Station Steel Erection Ongoing


G25 - Indstrial Water Pumps Station Steel Erection Ongoing

G02 - Raw Water Storage Asphalt Repair Completed

Demineralised Water Tank, Bottom Plate Installation Ongoing

G05 - Water Treatment Plant, Mechanical and Piping Installation Ongoing

G05 - Water Treatment Plant, Mechanical and Piping Installation Ongoing



B64 - Condenser Neck On Position

B63 - Steam Turbine Building, Civil Work Ongoing


B64 - Condenser Neck On Position


L05 - FGD Absorber Concrete Work Ongoing


B07 -  Fabric Filter, Casing Erection Ongoing

B17 - Flue Gas Ducts Erection Ongoing

B17 - Flue Gas Ducts Erection Ongoing

C05 - Coal Crusher House Civil Work Ongoing

D01 - Fly Ash Storage

G08 - Compressed Air Production Foundation and Column Work Ongoing