Power Block general view from North

B01. Boiler & Pressure parts erection,
view from  Bottom

B01. Boiler erection, view from bottom

B01. Boiler steel structure, Hot & Cool air
Duct erection, view from South

B01. Boiler steel structure and Silo duct ereciton
View from East

B02. Chimeny Liner Can erection

B06. Bunker bay area Pulverizer erection, view from North

B06. Bunker bay area Pulveriser erection, view from South

B07. Fabric filter Casing erection

B17. Flue gas duct and steel structure erection

B17. Flue gas duct and steel structure erection


B33. Unit electrical building plastering work Trsformer area

B33. Unit electrical building ground floor cable tray erection

B33. Unit electrical building 1st floor electrical work



B33. Unit electrical building plastering work, view from South

B33. Unit electrical building, 2nd floor




B35. Boiler electrical building lilfting switch gear panel

B35. Boiler Electrical building ground floor Cable tray erection

B35. Boiler electrical building 1st floor switch gear panel

B63. Condenser neck area, cooling water pipe outlet



B63. Condenser Neck area Outlet cooling water pipe


B63. Turbine hall  General view from North

B63. Condenser neck area cooling water outlet pipe

B63. Turbine hall General view from South

B63. Turbine hall steel structure erection, view from East

B63. Turbine hall Hp heater installation at 8 mlvl





B63. Turbine hall feed water pump, ground floor

B63. Condenser neck - welding work



B63. Turbine hall Steel structure erection ,view from South
 

B68. Auxiliary Transformer building

B68. Main transformer installation


C03 &30 Fuel oil pump station building

C05. Crusher house

C40. Light fuel oil storage tank erection




D01. Ash storage tank erection

E05. Under ground cooling water piping

E05. Cooling water piping installation

E50. Cooling water Outfall Turbine hall to Aeration



F06. Cable way foundation

G02. Raw water storage tank erection

G05. Demin Plant erection


G05. Demin plant erection


G17. Auxiliary boiler foundation

G08. Compressed air building & H03 pipe rack foundation



G20. Potable water storage tank erection



G28. Water recovering pit


GRP Lamination

H03. Pipe rack foundation work



L05. Absorber shell concrete work

B02. Liner can Lining work

L05. Absorber roof concrete work


L13. Aeration foundation work