08.12.2014 - Power block

Power Block
Plant generview from North

Coal handling system erection
B01. Boiler erection - bottom area pipe welding

B01. Air preheater erection

B01. Boiler bottom area

B01. Boiler windbox erection



B01. Boiler duct & tank erection, view from south

B01. Boiler general view from South



B06. Bunker bay area pulverizer erection

B07. Fabric filter casing erection

B10. ID fan and Fabric filter casing erection

B17. Flue gas duct erection

B33. Auxiliary transformer are cabling & termination

B33. Unit electrical building

B33. Unit electrical building - commissioning

B33. Control building

cable termination

B33. Unit electrical building roof area HVAC work





B06. Bunker area pulverizer erection

B63. Turbine building piping erection

B63. Feedwater  pump

B63. Condenser area welding work


B63, CCCW pump area Large bore pipe erection

B63. Condenser moduel erection

B63. Turbine hall general view from East




B63. Turbine hall - Top feed water tank erection

B63. 16m level general view

B63. Turbine hall general view from South

B68. Main transformer erection

C05. Crusher house - Roof area steel structur erection

E50. Outfall from Turbine to Aeration basin

C30. Fuel oil unloading area


B63. Turbine hall - Outfall concrete


HV cable pulling


G02. Rawwater storage tank erection

G05. Demin plant
H03. Pipe rack


G05. demin plant




G08. Compresser building inside view

G08. Compresser building general view

G16. Waste water treatment plant area

G17. Auxiliary boiler erection


G25. Wagter pump station and G02 Tank erection


G25. Water pump station area - pump erection




H01. Sleeper way erection



L10. Booster fan area erection

L13. Aeration basin area