Friday 30 January 2015

30.01.2015

Turbine Building 16.0m level
Turbine Building 16.0m level
Turbine Building 16.0m level
Turbine Building 16.0m level
Turbine Building 16.0m level
Turbine Building 16.0m level
Turbine Building 16.0m level
Turbine Building overhead crane
Turbine Building
Excavation east of Turbine Building
Turbine Hall north view
Power block north view
Piperack cable pulling
Piperack piping and cable pulling
MCW piping to pump station
MCW piping
MCW piping connecting to pump station
Pump station
Overhead crane at pump station
Intake area
Intake area

No comments:

Post a Comment

Note: only a member of this blog may post a comment.