Monday 23 March 2015

21.03.2015

Fabric Filter view from north
Fabric filter view from south
Fabric filter view from east
Turbine hall view from east
Turbine hall ground floor
IPB view from north
Cable pulling at Boiler north side
Cable pulling at Turbine Hall -5.2m level
Turbine Hall material lifting in progress
Unit Electrical Building rooftop
Unit Electrical Building rooftop
Condensate Make up tank rooftop
Main transformer area
Emergency diesel generator
Piperack 3.1
Piperack H03
Compressed air building
Raw water tanks
Light fuel oil tank
Potable water tank
Hazardous goods store
Demin plant
Demin plant
Cooling water underground piping
Industrial water pump station
MCW piping to CWPH
Boiler electrical building rooftop
FGD aeration basin civil work
FGD aeration basin
Work area between Boiler and Piperack H03
Underground cable pulling at Boiler south side
Light fuel oil piping and cabling