Friday 15 May 2015

15.05.2015


Main cooling water piping to Turbine hall
Section 1 D





Outfall  - Turbine hall Aeration


Outfall - Turbine to Aeration basin

FGD Pump station and Aeration basine

Aeration basine - and piping installation

Effluent discharge pipe from Absorber


Aeration Station - steel structure and motor installation

GRP piping work - Aeration basin

GRP pping and civil work

Aeration basin and Aeration station steel structure

Aeration Station motor installation

Ouotfall from Aeration basin

Outfall from Aeration to

No comments:

Post a Comment

Note: only a member of this blog may post a comment.