Thursday 2 July 2015

01.07.2015

Removal of sheet piles at cooling water backfilled area
Turbine hall Level -5.2m piping
Turbine hall Level -5.2m piping
Turbine hall Level -5.2m piping
Turbine hall Level -5.2m piping
Turbine hall Level -5.2m piping
Turbine hall Level -5.2m piping
Turbine hall Level -5.2m piping
Turbine hall Level -5.2m piping

No comments:

Post a Comment

Note: only a member of this blog may post a comment.