Boiler north side
Turbine hall
Steam blow temporary piping being removed
Steam blow temporary piping being removed
Steam blow temporary piping being removed
Nitrogen gas storage
Nitrogen gas storage
Bulk tanks
Turbine hall
IPB
Turbine hall
Turbine hall
Turbine hall Level +16.0m
Turbine hall Level +16.0m
Turbine hall Level +16.0m
Turbine hall Level +16.0m
Turbine hall
Turbine hall
Turbine hall
Turbine hall
Turbine hall
Turbine hall
Turbine hall
Turbine hall
Turbine hall
Turbine hall
Waste water treatment plant
Waste water treatment plant
FGD Aeration basin pump station
FGD
FGD Aeration basin pump station