Monday 7 September 2015

08.09.2015

Boiler PA/FD fans north side
Boiler north side
Boiler scrapper foundation
B89b Gas storage
Turbine hall Level -5.2m
Turbine hall Level -5.2m
Turbine hall Level -5.2m
Turbine hall Level -5.2m
Turbine hall Level -5.2m
Turbine hall Level -5.2m - sea water pit
Turbine hall Level -5.2m - sea water pit
IPB view from south
Turbine hall Level +16.0m - Lube oil room
Turbine hall Level +16.0m - Lube oil room
Turbine hall Level +16.0m
Turbine hall Level +16.0m
Turbine hall Level +16.0m
Turbine hall Level +16.0m
Turbine hall Level +16.0m
Turbine hall Level +16.0m
Turbine hall Level +16.0m
Turbine hall Level +16.0m
Turbine hall Level +16.0m
Turbine hall Level +16.0m
Turbine hall Level +16.0m
Turbine hall Level +16.0m
Civil pit foundation at Boiler south
Civil pit foundation at Boiler south
FGD aeration pump station
Waste water treatment plant
FGD aeration basin
FGD aeration basin
Fly ash silo
FF air compressed station