Saturday 9 January 2016

09.01.2016 - Site overall photo


Overall site photo
Power plant general view from North
FGD & Crusher house area general view
Boiler area general view - North side

Fabric filter area - North side

Slag conveyor system

Slag conveyor system
Gas storage building

Main cooling water outfall area
Bunker area

Excitation pump area



Plosh plant area

Plosh plant area

Turbine hall 0 level

Turbine hall 0 level

Turbine hall ground floor

Turbine hall ground floor

Turbine hall ground floor area

Turbine hall ground floor - Feed water pump

Main transformer area - civil work

Turbine hall 11 m level

Turbine hall 11 m level area

Turbine hall 11 m level

Turbine hall 11 m level

Turbine hall 11 m level

Turbine hall 16 m level

Turbine hall 16 m level

Turbine hall 16 m level



Turbine hall 16 m level

Turbine hall 16 m level

Turbine hall South side - road work

Turbine hall South side - road work


Water treatment area - civil work


Fuel oil unloading area

Auxiliary boiler building

Boiler general view from South

Fabric filter South side

Boiler South side

Boiler South side

FGD pump station

Waste water treatment area

Fabric filter South side

FGD area East side

FGD pump station

Aeration station

FGD South side

Boiler West side

FGD area west side

Absorber area

Fabric filter North side

Ash handling system