Coal Handling Transfer Tower TT16
Steel structure erection

TT17. Steel structure erection

TT18. Foundation work

TT19. Foundation work

TT20. Transfertower foundation

TT21. Steel structure erection

TT20. Foundation work

 
B01. Boiler steels structure
B07.  Fabric Filter steel structure erection

B07. Fabric filter steel structure erection,
view from West

B01. Steel structure & Silo duct erection,
view from South

B06. Bunker Bay steel structure and
Silo duct erection, view from East

B07. Fabric filter Steel structure erection,
view from North

B07. Fabric filter Steel structure erection,
view from West

B07. Fabric filter Hopper and Casing assembly

G17. Auxiliary Boiler Foundation work

B33. Unit electrical building
3rd floor slab work, view from south

B35. Boiler electrical building
auxiliary transformer area

B35. Boiler electrical building
2nd floor column erection

B63. Preparation for Concrete pouring
basement of Turbine Hall



C05. Crusher house column erection

C30. Fuel oil unloading area
pile cap preparatoin

C40. Light fuel oil storage area

C71. Electrical building near Crusher house

C72. Electrical building near Bunker Bay

D01. Ash storage foundation work

L05. Absorber shell - side wall rebar installation,
And Sheet pile for GRP pipe


L13 - Aeration basin area
sheet piling for GRP pipe

L13. Aeration basin pile cap preparation

Friday, 24 January 2014

24.01.2014


B01. Pressure parts assembly at site

B01. Pressure parts item preparation for lift

B01. Pressure parts erection, view from bottom

B07. Farbic filter steel structure and B01. 
Boiler steel structure erection 

B01. Boiler area piping erection 

B01. Boiler steel structure Tier 6 & 7, and
Silo duct erection, view from South

B06. Bunker bay area structure erection

B06. Bunker bay area steel structure
and silo duct erection



B33. Unit electrical buiding,
3rd floor slab concrete wor

B33. Unit electrical building
1st floor plastering work

B33. Unit electrical building
auxi. tranformer area

B07. Fabric Filter steel structure erection




B07.  Hopper and Casing assembly

B63. Turbine basement concreting work






B68. Auxiliary transformer area

B68. Main transformer building
concrete repair work

C05. Crusher house column erection

C30. Fuel oil unloading area excavation

C71. Electrical building near crusher house

C72. Electrical building near Bunker bay

D01. Ash storage foundation work

F06. Cable bay area

G05. Demineralized water production foundation

G06. Demineralized water effluents foundation
work

G17. Auxiliary boiler foundation

G18. Reserve feed water storage

G25. Operational industrial water pump station
foundation

B35. Boiler electrical building
2nd floor column erection

L05. Absorber shell concrete work

Cold reheat piping erection