Friday 24 January 2014

24.01.2014


B01. Pressure parts assembly at site

B01. Pressure parts item preparation for lift

B01. Pressure parts erection, view from bottom

B07. Farbic filter steel structure and B01. 
Boiler steel structure erection 

B01. Boiler area piping erection 

B01. Boiler steel structure Tier 6 & 7, and
Silo duct erection, view from South

B06. Bunker bay area structure erection

B06. Bunker bay area steel structure
and silo duct erection



B33. Unit electrical buiding,
3rd floor slab concrete wor

B33. Unit electrical building
1st floor plastering work

B33. Unit electrical building
auxi. tranformer area

B07. Fabric Filter steel structure erection




B07.  Hopper and Casing assembly

B63. Turbine basement concreting work






B68. Auxiliary transformer area

B68. Main transformer building
concrete repair work

C05. Crusher house column erection

C30. Fuel oil unloading area excavation

C71. Electrical building near crusher house

C72. Electrical building near Bunker bay

D01. Ash storage foundation work

F06. Cable bay area

G05. Demineralized water production foundation

G06. Demineralized water effluents foundation
work

G17. Auxiliary boiler foundation

G18. Reserve feed water storage

G25. Operational industrial water pump station
foundation

B35. Boiler electrical building
2nd floor column erection

L05. Absorber shell concrete work

Cold reheat piping erection

No comments:

Post a Comment

Note: only a member of this blog may post a comment.