B01. Boiler Steel structure erection,
view from North

B01. Boiler Steel structure erection,
view form North

B01. Boiler Steel structure erection,
view from Bunker Bay

B01. Boiler Steel structure erection,
view from Bunker Bay

B01. Boiler Steel Structure erection,
view from South

B01. Boiler Steel structure erection,
view from South

B02. Chimney Slip form erection

B07. Fabric Filter - pile cap preparation

B10. ID Fan - Pile cap preparation

B17. Boiler flue gas duct foundation work

B33. Unit Electric building - ground floor erection

B33. Unit electrical building ground floor
- concreting

B33. Boiler electrical building,
tie-beam concreting work

B63. Turbine Hall North side - civil work

B63. Turbine Hall South side, view from North

B63. Turbine Hall- norhth side civil work, view from
South


B63. Turbine hall - Additional piling work,
view from South

B68. Tranformer Foundation - rebar installation,
view from South

                                           D01. Ash Storage - Bore Piling work

E50. Cooling water culvert - Piling work

E50. Cooling water culvert - Piling work

L05.  Absorber Foundation - Rebar installation

L10. Booster Fan - Foundation work

L13. Aeration Basin - piling work

L24. FGD Duct foundationo work
                                           
                                           Piping fabrication at site.