Monday 20 April 2015

16.04.2015

Boiler pulveriser view from north
Fabric filter
Fabric filter view from south
Turbine hall ground floor
Turbine hall lube oil room
Turbine hall +16.0m level
Turbine hall rotor at +16.0m level
Turbine hall +16.0m level
Turbine hall generator +16.0m level
Turbine hall rotor before lifting
Cooling water piping at Turbine hall
FGD GRP piping near FGD area
MCW piping towards CWPH
Piperack H03
Piperack H03

No comments:

Post a Comment

Note: only a member of this blog may post a comment.