Monday 20 April 2015

20.04.2015

Turbine hall +16.0m level
Turbine hall +16.0m level
Turbine hall Lube oil room
Turbine hall Lube oil room
Boiler acid waste pit
Demin plant
Light fuel oil tank
Piperack H03
Piperack H03
Aeration basin
MCW piping
IPB
Cooling water piping at Turbine hall
IPB
Turbine hall +16.0m level
Lube oil flushing preparation
Lube oil room at Turbine hall
Turbine hall +16.0m level
Turbine hall +16.0m level
Turbine hall +16.0m level
Turbine hall +16.0m level
Turbine hall generator at +16.0m level
Turbine hall generator at +16.0m level
Turbine hall +16.0m level
Turbine hall Lube oil room
Cooling water piping at Turbine hall

No comments:

Post a Comment

Note: only a member of this blog may post a comment.