Tuesday 9 June 2015

08.06.2015

Boiler PA/FA fans north side
Boiler SSC north side
Fabric filter
Turbine hall
Turbine hall view from east
MCW header outlet at Turbine hall
MCW header outlet at Turbine hall
MCW header outlet at Turbine hall
MCW header outlet at Turbine hall
Steam blow piping at Turbine hall
Steam blow piping at Turbine hall
Steam blow piping at Turbine hall
Steam blow piping at Turbine hall
Steam blow piping at Turbine hall
Steam blow piping at Turbine hall
Turbine hall Level -5.2m
Piping insulation at Turbine hall
Turbine hall piping
Steam blow piping at Turbine hall Level +16.0m
Steam blow piping at Turbine hall Level +16.0m
Turbine hall Level +16.0m
Steam blow piping at Turbine hall Level +16.0m
Steam blow piping at Turbine hall Level +16.0m
Steam blow piping at Turbine hall Level +16.0m
Turbine hall Level +16.0m
Steam blow piping at Turbine hall Level +16.0m
Steam blow piping at Turbine hall Level +16.0m
Turbine hall Level +16.0m
Turbine hall Level +16.0m
Turbine hall Level +16.0m
Turbine hall Level +16.0m
Turbine hall Level +16.0m
Turbine hall Level +16.0m
Turbine hall Level +16.0m
Turbine hall Level +16.0m
Turbine hall Level +16.0m
Turbine hall Level +16.0m
Turbine hall Level +16.0m
Turbine hall Level +16.0m
Turbine hall Level +16.0m
Turbine hall Level +16.0m - Lube oil flushing in progress
Turbine hall Level +16.0m
Turbine hall Level +16.0m
Turbine hall piping insulation
Acid cleaning piping
MCW piping at road diversion
Cooling water piping at Turbine hall backfilled
Cooling water piping at Turbine hall backfilled
Cooling water piping at Turbine hall
Cooling water piping at Turbine hall
Cooling water piping at Turbine hall - Section 1D
Cooling water piping
Cooling water piping
Cooling water piping
Cable drums at centre of Unit Electrical Building and Turbine hall

No comments:

Post a Comment

Note: only a member of this blog may post a comment.