Monday, 22 July 2013

22.Jul.13

B06. Bunker bay South side

B06 Bunker bay North  area rebar installation

B06. Bunker bay North side form work for concrete

B06. Bunker bay North side form work for concrete

                                        B01. Boiler Foundation strengthning work - backfilling
                                                 view from South 

B01. Boiler Foundation strengthning work - backfilling
                                              view from South 

B01. Boiler Foundation strengthning work - backfilling
                                              view from North 

B01. Boiler Waste Water Pit- 
view from West 


B01. Boiler Foundation strengthning work - backfilling
                                              view from North  


                                       B63. Turbine hall. piling work view from South
                                                 Left side                                                               

    B63. Turbine hall. piling work view from South
middle area
                                   


                                        B63. Turbine hall. piling work view from South
                                                 Right side


B33. Unit Electrical Building - groundfloor form work

B33. Unit Electrical Building - groundfloor form work



                                       B68. Tranformer - foundation work

E50. Cooling water culverts - Piling work


                                       B35. Boiler electrical building - tie-beam concrete


                                       L10 - Booster Fan - Foundation rebar installation

L05. FGD Absorber - Pile cap preparation


                                       B02 - Chimney - Backing  filling completion

Friday, 19 July 2013

19.07.2013


B06. Bunker Bay South Side,
reconstruction work

B06. Bunker Bay North
Rebar Installation in progress
                                        

                                   B01. Boiler Foundation connection beam
                                (strengthning work) Back filling, view from North

                                  B01. Boiler Foundation connection beam
                                  (strengthning work) Back filling, view from South

B01. Boiler Foundation connection beam
                                (strengthning work) concreting, view from North

B01. Boiler Foundation connection beam
                                (strengthning work) concreting, view from South 

B01. Boiler Foundation connection beam
                                (strengthning work) concreting, view from West 

B01. Boiler FD Fan Foundation Concrete

B63. Turbain Hall - Piling work, view from North

B63. Turbain Hall - Bore Piling work, North Side

B63. Turbain Hall - Bore Piling work, North Side



B63. Turbain Hall -  Piling work, view from South


B33. Electrical Building Ground Floor work,
view from South

B33. Electrical Building Ground Floor work,
view from North


B02. Chimney - Foundation finishing work


D01. Ash Storage - Bore piling work


                                       E02 - Cooling Water Pump Station - concreting work

E05. Cooling water piping - Sleeper's work  


E50. Cooling Water Culvert - Piling work

L05. Absorber - Pile cap preparation


L13. Aeration Basin - Piling work

B01. Boiler Duct Preassembling work - Inside Plant



Thursday, 18 July 2013

18.07.2013

B06. Bunker Bay South Side,
Back filling after water proof painting 

B06. Bunker Bay North Side,
Rebar installation for concrete

B01. Boiler Foundation connection beam -
(strengthning work) Back filling, view from North side

B01. Boiler Foundation connection beam -
(strengthning work) Back filling, view from South side

B01. Boiler Foundation connection beam, 
strengthning work steel fixing, view from North Side

 B01. Boiler Foundation connection beam, 
strengthning work, view from South Side


B01. Boiler FD Fan Foundation concreting, 
view from West

B01. Boiler FD Fan Foundation concreting, 
view from South

 
                                           B33. Electrical building Ground Floor
                                                    view from East
  
B33. Electrical  Building Ground floor work,
view from South


B63. Turbain Hall - Piling work, view from North

  
                                             B63. Turbain Hall - North Side Bore piling work

                                            B63. Turbain Hall - East Side piling work

B63. Turbain Hall - Piling work, view from South
 

B02. Chimney Foundation - back filling


                                            L10. Booster Fan foundation reinforcement work


B68. Transformer - Steel fixing
                                                           
                                           D01. Ash Storage - Bore piling work
                                     
                                           
                                           C06 - Coal Conveyor between C05 & c07 (TT23)

                                           L13. Aeration Basin - Piling work

                                           L05. FGD Absorber - Pile Cap preparation
                                        
                                           C40. Light Fuel Oil Storage - Piling work