Monday 22 July 2013

22.Jul.13

B06. Bunker bay South side

B06 Bunker bay North  area rebar installation

B06. Bunker bay North side form work for concrete

B06. Bunker bay North side form work for concrete

                                        B01. Boiler Foundation strengthning work - backfilling
                                                 view from South 

B01. Boiler Foundation strengthning work - backfilling
                                              view from South 

B01. Boiler Foundation strengthning work - backfilling
                                              view from North 

B01. Boiler Waste Water Pit- 
view from West 


B01. Boiler Foundation strengthning work - backfilling
                                              view from North  


                                       B63. Turbine hall. piling work view from South
                                                 Left side                                                               

    B63. Turbine hall. piling work view from South
middle area
                                   


                                        B63. Turbine hall. piling work view from South
                                                 Right side


B33. Unit Electrical Building - groundfloor form work

B33. Unit Electrical Building - groundfloor form work



                                       B68. Tranformer - foundation work

E50. Cooling water culverts - Piling work


                                       B35. Boiler electrical building - tie-beam concrete


                                       L10 - Booster Fan - Foundation rebar installation

L05. FGD Absorber - Pile cap preparation


                                       B02 - Chimney - Backing  filling completion

No comments:

Post a Comment

Note: only a member of this blog may post a comment.