Thursday 18 July 2013

18.07.2013

B06. Bunker Bay South Side,
Back filling after water proof painting 

B06. Bunker Bay North Side,
Rebar installation for concrete

B01. Boiler Foundation connection beam -
(strengthning work) Back filling, view from North side

B01. Boiler Foundation connection beam -
(strengthning work) Back filling, view from South side

B01. Boiler Foundation connection beam, 
strengthning work steel fixing, view from North Side

 B01. Boiler Foundation connection beam, 
strengthning work, view from South Side


B01. Boiler FD Fan Foundation concreting, 
view from West

B01. Boiler FD Fan Foundation concreting, 
view from South

 
                                           B33. Electrical building Ground Floor
                                                    view from East
  
B33. Electrical  Building Ground floor work,
view from South


B63. Turbain Hall - Piling work, view from North

  
                                             B63. Turbain Hall - North Side Bore piling work

                                            B63. Turbain Hall - East Side piling work

B63. Turbain Hall - Piling work, view from South
 

B02. Chimney Foundation - back filling


                                            L10. Booster Fan foundation reinforcement work


B68. Transformer - Steel fixing
                                                           
                                           D01. Ash Storage - Bore piling work
                                     
                                           
                                           C06 - Coal Conveyor between C05 & c07 (TT23)

                                           L13. Aeration Basin - Piling work

                                           L05. FGD Absorber - Pile Cap preparation
                                        
                                           C40. Light Fuel Oil Storage - Piling work
                                       