Wednesday, 25 December 2013

26.12.2013



                                          B01. Boiler steel structure & Duct erection
                                                                      View from West


B06. Bunker Bay area Steel structure,
Grating & Silo duct erection, view from East

B06. Bunker bay area grating erection

B01. Steel Structure, grating & Duct erection,
View from South

B33. Unit electrical building
2nd floor column erection, view fromWest

B33. Unit electrical building
2nd floor column erection, view from East

C72. Electricla building near Bunker bay
foundation work

C40.  Light fuel oil storage area retention work

C30 Fuel oil unloading area
                                           
                                           B35. Boiler Electrical building
                                                    and Boiler Auxiliary Transformer area

B01. Pressure parts assembly at site

B06. Silo Duct at site for erection 

B07. Fabric Filter area Substructure work,
rebar & concrete reinforcement work-South Side

B07. Fabric Filter area, concret North side



B02. Chimeny erection,
concrete pouring in progress


B63. Turbine Hall - Excavation

B63. Turbine Hall 2B strip concrete


B63. Turbine Hall South side basement,
steel rebar installation


C05. Crusher house foundaation concrete

C71. Electrical building near Crusher Houses

D01. Ash storage pile cap and lean concrete,
preparation

E05. Cooling water piping sleeper foundation

F01. Switchyard Gantry area

G05. Demineralized water production area,
column erection

G17. Auxiliary Boiler - pile cap and
Lean concrete work

L05. Absorber Shell side wall rebar installation &
For GRP pipe sheet piling.


Sunday, 22 December 2013

23-12-2013



B01. Pressure parts assembly at site

B01. Boiler steel structure & Duct
erection in progress 

B01. Boiler steel structure erection
view from West

B06. Bunker bay area Steel structure
and Duct erection, view from East

B01. Silo duct at Boiler area for lift

B01. Pressure parts item at site of lift

B02. Chimney erection,
concrete pouring in progress


B07. Fabric filter area
substructure work at South side

B07. Fabric filter area
substructure concrete North side

Emergency dieseal Generator foundation work

B33. Unit electrical building,
2nd floor column erection

B33. Unit electrical build
transformer area foundation concrete

B33. Unit electrical building
first floor plastering work


B35. Boiler electrical building,
2nd floor slab concrete

B63. Turbine hall - Strip 2b concrete & excavation

B63. Turbine Hall 2b Strip concreted 

C05 Crusher house foundation concrete

C30. Fuel oil unloading area sheet piling

C71. Electrical building near Crusher house
1st Floor column erection

D01.  Ash storage foundation area
pile cap preparation

E05. Cooling water piping Sleepers foundation

G05. Demineralized water proudction
column erection

G17. Auxiliary Boiler foundation work

G25. Operational industrial water pump station
Foundation work

L13. Aeration Basin sheet piling

L05. Absorber Side wall rebar installation