B01. Pressure parts assembly at site

B01. Boiler steel structure & Duct
erection in progress 

B01. Boiler steel structure erection
view from West

B06. Bunker bay area Steel structure
and Duct erection, view from East

B01. Silo duct at Boiler area for lift

B01. Pressure parts item at site of lift

B02. Chimney erection,
concrete pouring in progress


B07. Fabric filter area
substructure work at South side

B07. Fabric filter area
substructure concrete North side

Emergency dieseal Generator foundation work

B33. Unit electrical building,
2nd floor column erection

B33. Unit electrical build
transformer area foundation concrete

B33. Unit electrical building
first floor plastering work


B35. Boiler electrical building,
2nd floor slab concrete

B63. Turbine hall - Strip 2b concrete & excavation

B63. Turbine Hall 2b Strip concreted 

C05 Crusher house foundation concrete

C30. Fuel oil unloading area sheet piling

C71. Electrical building near Crusher house
1st Floor column erection

D01.  Ash storage foundation area
pile cap preparation

E05. Cooling water piping Sleepers foundation

G05. Demineralized water proudction
column erection

G17. Auxiliary Boiler foundation work

G25. Operational industrial water pump station
Foundation work

L13. Aeration Basin sheet piling

L05. Absorber Side wall rebar installation