Wednesday 25 December 2013

26.12.2013



                                          B01. Boiler steel structure & Duct erection
                                                                      View from West


B06. Bunker Bay area Steel structure,
Grating & Silo duct erection, view from East

B06. Bunker bay area grating erection

B01. Steel Structure, grating & Duct erection,
View from South

B33. Unit electrical building
2nd floor column erection, view fromWest

B33. Unit electrical building
2nd floor column erection, view from East

C72. Electricla building near Bunker bay
foundation work

C40.  Light fuel oil storage area retention work

C30 Fuel oil unloading area
                                           
                                           B35. Boiler Electrical building
                                                    and Boiler Auxiliary Transformer area

B01. Pressure parts assembly at site

B06. Silo Duct at site for erection 

B07. Fabric Filter area Substructure work,
rebar & concrete reinforcement work-South Side

B07. Fabric Filter area, concret North side



B02. Chimeny erection,
concrete pouring in progress


B63. Turbine Hall - Excavation

B63. Turbine Hall 2B strip concrete


B63. Turbine Hall South side basement,
steel rebar installation


C05. Crusher house foundaation concrete

C71. Electrical building near Crusher Houses

D01. Ash storage pile cap and lean concrete,
preparation

E05. Cooling water piping sleeper foundation

F01. Switchyard Gantry area

G05. Demineralized water production area,
column erection

G17. Auxiliary Boiler - pile cap and
Lean concrete work

L05. Absorber Shell side wall rebar installation &
For GRP pipe sheet piling.


No comments: