Saturday 12 April 2014

12.04.2014

Boiler steel structure general view from North Side


ADV Module steel structure assembly


B01. Boiler steel structure and duct erection,
view from North

B01. Boiler pressure parts erection

B01. Boiler pressure parts and duct erection,
view from bottom

B01. Boiler duct erection, view from bottom

B01. Boiler pressure parts erection

B63.  Turbine hall - slab concrete

B01. Boiler steel structure erection, view from North

B01. Boiler pressure parts assembly

B01. Boiler steel structure, view from East


B01. Boiler steel structure & pressure parts erection,
View from South

B01. Boiler steel structure and press parts erection,
B07. Fabric filter hopper erection,
B17. Flue gas duct assembly,
View from West

B01. Boiler steel structur, pressure parts & Duct erection
B07. Fabric filter hopper and Casing erection
D01. Ash storage structure erection
Fabric filter casing erection started on 11-04-14
View from North


B01. Boiler Rear side steel structure erection

B06. Bunker bay area, view from North

B06. Bunker bay are steel plate erection


B06. Bunker bay area Steel structure and Silo duct erection



B07. Fabric filter casing erection, started on 11-04-14
View from South


B01. Boiler steels structure and
B07. Fabric filter casing erection,
view from West





B07. Flue gas duct assembly at site

B17. flue gas duct area steel structure erection


B33. Unit electrica builing ground floor Cable tray erection

B33. Unit electrical building 1st floor HVAC duct erection

B33. Unit electrical building 3rd floor slab concrete work

B33. Unit electrical building, general view from South

B35. Boiler electrical building
ground floor - marking for cable tray erection

B35. Boiler electrical building floor ground floor

B35.. Boiler electrical building 1st floor HVAC duct erection



B63. Turbine hall, viewfrom West

B63. Turbine hall view from North

B63. Turbine hall, 0"level slab concrete


B63. Hotwell section on position, view from South

B63. Steel structure at site for erection of Turbine hall area

B68. Auxiliary Transformer building


C05. Crusher house building 2nd floor slab concreting work


C71. Electrical building near Crusher house

C72. Electrical building near Bunker bay


D01. Ash stroage structure work

C03. Fuel oil pump station foundation work


E05. Cooling water piping sleeper foundation work

C30. Fuel oil unloading area foundation work


E50. Cooling water culvert Turbine hall to Aeration
- foundation work


F01. Switch yard structure work

F01. Switch gantry installation

F01. Switch yard - gantry installation

F06. Cable way foundation

G05. Demin. water production equipment erection

G05. Demin water - equipment erection


G06. Demin water effluent foundation



G08. Foundation work

B17. Auxiliary boiler foundation


G25. Operational  industrial water pump station,
view from South

G25. Operational industrial water pump station,
Steet structure erection, view from North


L05. Absorber shell side wall concrete work

L13. Aeration basin piling work

L13. Aeration basin basement concrete work

L24. FGD Duct foundation work

No comments:

Post a Comment

Note: only a member of this blog may post a comment.