25.04.2014

ADV Module steel structure assembly

B01. Boiler steel structure general view from North

B01. Boiler steeel structure & duct erection
view from  North

B01. Boiler pressure parts positioning for lift

B01. Pressure parts erection,
view from botttom

B01. Pressure parts erection,
view from  bottom

B01. Boiler pressure parts item positioning for lift


B01. Boiler steel structure erection,
view from East

B01. Pressure parts assembly

B01. Boiler steel structure erection South side,
ADV Module assembly, view from East


B01. Boiler steel structure, duct & pressure parts
erection, viewfrom South

B01. Steel structure and duct erect at rear side of boiler

B01. Boiler steel structure,
General view form West

B01. Boiler steel structure,
General view form West


B06. Bunker bay area sole plate installation

B07. Fabric filter casing erection, view from East

B07. Fabric filter casing erection, view from West

B07. Fabric filter casing erection, view from North

B17. Flue gas duct assembly & erection\
view from South

B17. Flue gas duct steel structure and duct erection,
view from North


B33. Unit electrical building 1st floor, HVAC duct erection

B33. Unit electrical building, 3rd floor slab concreete work

B33.Unit electrical building, view from South

B35. Boiler electrical building, painting work
View from East

B35. Boiler electrical building ground floor cable tray erection

B35. Boiler electrical building ground floor general view

B35. Boiler electrical building, 1st floor, plastering work

B63.Turbine concrete work, view from West


B63.Tubrine hall steel structure erection, view from North

B63. Turbine hall steel structure ereciton, view from East

B68. Auxiliary transformer building area, bore piling

B68. Main transformer building, grating installation

C03. Fuel oil pump station

C05. Coal Crusher house building


C30 Fuel oil unloading area

C40. Fuel oil storage tank area

C71. Electrical building

D01. Ash stroage structure erection,
slipform concrete puring in progress

E05. Cooling water piping sleeper foundation

E50. Cooling water culvert foundation work

F06. cable way foundation

G05. Demin water production equipment erection

G05. Demin water proudction equipment erection


G06. Demin effluent foundation

G08. Compressed air proudction foundation
and column erection

G17. Auxiliary boiler foundation

G25. operational industrial water pump station -
steel structure erection, view from North side

  G25. operational industrial water pump station -
building plastering work

G28. OIl Fire Fighting water recovery pit - sheet piling work

L05. Absorber sheel concrete work

Aeration station area

L13. Aeration basin

L24. FGD Duct foundation


B33. Unit electrical building, ground floor cable tray erection

L13. Aeration basiment concrete work