Monday 9 June 2014

09.Jun.2014


Plant general view from North

B01. Pressure parts item for erection


B01. Boiler pressure parts item erection, view from bottom

B01. Boiler pressure parts erection, view from Bottom

B01. Boiler Steel structure, duct & Pressure parts
erection, General view from South


B01. Boiler steel structure & pressure parts erection,
B07. Fabric filter hopper and casing erection


B01. Boiler Rear side Steel structure and duct erection

B06. Pulverizer erection

B06. Pulverizer erection


B06. Bunker bay area silo duct and structure erection

B06. Pulversier erection, view from South


B07. Fabric filter area bore piling for pipe rack

B07. Fabric filter Casing erection, view from West

B07. Fabric filter hopper and casing erection, view from North


B17. Flue Gas duct and Steel Structure erection,
View from South

B33. Unit electrical building, Transformer area

B33. Unit electrical building ground floor, cable tray erection

B33. Unit electrical building 1st floor

B35. Boiler electrical building, view from East


B35.  Boiler electrical building ground floor, cable tray erection

B63. Turbine hall view from North

B63. Turbine hall, view from Bunker bay area

B63. Turbine hall Condensate tank and ADV module

B63. Turbine hall view from North. Condenser neck erection

B63. Turbine hall North side steel rebar installation

B63. Turbine hall  - condenser neck welding


B63. Turbine hall steel structure erection, view from North

B63. Turbine hall steel erection overall view from South

B63. Turbine hall general view from South

B63. Turbine hall - Feed water pump

B63. Turbine hall - Vacuum Pump



B68. Auxiliary Transformer building

B68. Main transformer building


B68. Main Transformer installation

 
C03_C30. Fuel oil pump station foundation

C05. Crusher house building

C40. Light fuel oil storage Retention work

C71. Electrical building near Cursher house

C71. Electrical building ground floor

C72. Electrical building near Bunker bay

C72. Electrical building ground floor


D01. Ash storage structure concrete work

E05. Cooling water piping sleeper foundation and
under ground pipe installation

E05. Under ground pipe installation

E50. Outfall culvert - Turbine hall to Aeration station


F06. Cable way foundation

G05. Demin water production plant equipement erection



G07. Demineralized water stroage tank erection
G20. Potable water storage tank erection

G08. Compressed air production building

G17. Auxiliary boiler foundation work

G20. Industrial water pumpstation building ground floor

G20. pump at site

G20

G28. Oil & Fire fighting water pump station




H03. pipe rack foundation

H03. Pipe rack foundation - tank area

H03. Pipe rack foundation near Fabric filter area

L05.  Absorber shell concrete work


L24. FGD Duct foundation

No comments:

Post a Comment

Note: only a member of this blog may post a comment.