Wednesday 18 June 2014

18.06.2014

B01. Boiler steel structure general view from North

B01. Boiler pressure parts erection


B01. Boier pressure parts erection,
view from bottom


B01. Boiler pressure parts at site for erection


B01. Boiler pressure parts, steel structure and duct erection,
General view from West

B06. Bunker bay area pulveriser erection

B06. Bunker bay area Silo duct erection


B17. Flue gas duct erection

B33. Unit electrical building pastering work, viev fromEast

B33. Unit electrical building, ground floor cable tray erection

B33. Unit electrical building fire fighting work

B33. Unit electrical building 2nd floor plastering work

B33. Unit electrical building general view from South

B35. Boiler electrical building ground floor cable tray erection

B35. Boiler electrical building 1st floor


B63. Turbine hall North side concrete piller work

B63. Turbine hall condenser neck area


B63. Turbine hall view from North, steel rebar installation for
side wall concrete and steel structure erection

B63. Turbine steel structure general view from Top

B63. Turbine hall steel structure North side, over view


B63. Turbine hall Steel structure, view from South

B68. Auxiliary Transformer building

B68. Main transformer Installation

C03_C30 Light fuel oil pump station

C40. Fuel oil storage tank area

C72, Electrical building area

C72. Electrical building near bunker area

D01. Ash storage structure erection


Turbine hall - Dosing system

E05. Cooling water underground pipe installation

E50. Outfal Culvert foundation

F06. Cable way foundation

B63. Turbine hall feedwater Pump & Motor installation


G02. Tank area

G05. Demin water proudction plant erection

G07 & G20. Demin and Potable storage tank erection

G08. Compressed air proudction plant and
H03. Pipe rack foundation

G17. Auxiliary boiler foundation



G25. Operational industrial water pump station

G28. Oil & fire fighting water recovery pit

H03. Pipe rack foundation near tank area

H03. Pipe rack foundation near Fabric filter area

L05. Absorber shell concrete work


L13. Aeration Basin foundation work

L13. Aeration basin

No comments:

Post a Comment

Note: only a member of this blog may post a comment.