Monday 4 August 2014

02.08.2014

Power block general view from North

B01. Boiler North side Hot & Cool Air duct erection, view from North


B01. Boiler & Pressure parts erection,
view from bottom

B01. Boiler erection


B01.Boiler & pressur parts erection, view from Bottom



B01. Boiler pressure parts erection




B01. Boiler South side Hot & Cool Air duct erection

B01. Boiler steel structure,&  pressure parts erection, view from West

B01. Boiler steel structure general view from South




B06. Bunker bay area Pulverizer erection, , view from North

B06. Bunker bay area Pulverizer erection

B17. Flue Gas duct & steel structure erection

B07. Fabric filter casing erection, view from South


B33. Unit electric building plastering work view from East

B33. Unit electrical building 1st floor cable tray erection

B68. Auxiliary transformer on position

B33. Unit electrical building 2nd floor,

B33, Unit electrical building 2nd floor

B35. Boiler electrical building general view

B35. Boiler electrical building Auxiliary transformer positioning

B35. Boiler electrical building ground floor cable tray erection

B35. Boiler electrical building 1st floor switch gear panel installation

B35, Switch gear panel installation


B63. Turbine hall Table concrete work, general view from North



B63. Turbine hall area general view from North

B63. Turbine hall HP heater desupper heater erection -16m lvl.

B63. Turbine hall - 8m lvl


B63. HP heater lifting

b06. Bunker bay area  Silo duct erection and  roof steel structure erection



B63. Condenser neck lower welding

B63. Cooling water Booster pump installation


B63. Turbine hall big bore pipe erection

G17. Auxiliary boiler erection

B63. Turbine hall ground floor

B63. Turbine hall steel structure erection, view from South

B33. Unit electrical building ,view from South




B68. Auxiliary transformer positioning

B68. Main transformer installation


C05. Crusher house


C40. Tank erection

C72. Electrical building inside

D01. Ash storage structure erection



L40. FGD Measuring pit foundation work

F06. Cable way foundation

G02. Raw water storage tank erection


G05. Demin plant erection

G05. Demin plant steel structure and H03 pipe rack installation



G08.Compressed air bulding

G28. Oil and fire fighting water recovery pit foundation



G17. Auxiliary boiler installation, overview


G25. Water pump station motor installation




B17. Flue gas duct and steel structure erection,
L05. Absorber shell concrete


L10. Booster fan motor installation

L13. Aeration basin foundation work

L24. FGD duct foundation