Saturday 9 August 2014

9.08.14 - Power Block


Power Block general view from North


B01. Boiler Hot and Cool air Duct erection


B01. Boiler erection, view from Bottom

B01. Boiler piping erection

B01. Boiler rear side Duct erection

B01. Boiler & Pressure parts erection,
view from Bottom

B01. Boiler Hot & Cool Air duct erection,
View from South



B01. Boiler Hot & Cool air duct erection, view from West



B06. Pulveriser erection, view from North

B06. Pulversier erection, view from South

B07. Fabric filter casing erection, view from North

B17. Flue Gas Duct and  steel structure erection

B17. Flue gas duct & steel structure erection, view from North




B33. Unit electrical building plastering work,

B33. Ground floor cable tray erection

B33. Unit electrical building plastering work,
view from North


B35. Boiler electrical building

B35. Ground floor cable tray erection

B35. Boiler electrical building 1st floor, Switch gear panel
Installation

B35. Boiler electrical building, switch gear board installation

B63. Turbine hall Turbine Table concrete work

B63. Pile cap preparation North side


B63. Turbine hall -
preparation of concrete poring for Turbine table

B63. Turbine hall ground floor, Big bore pipe erection

B63. Turbine hall - Feed water pump installation and alignment


B63. T.H. - Big bore pipe erection

B63. Condenser Neck erection

B63. Turbine Table preparation for concrete


B663. Turbine hall , general view from South



B63. Auxiliary Transformer installation


B68. Mian transformer installation


C03_C30 - Light fuel oil pump station foundation

C05. Crusher house building

C40. Light fuel oil storage tank erection

C73 - Electrical building inside

D01. Ash stroage structure erection

E05. Under ground cooling water piping sleeper foundation

E50. Outfall culvert Turbine hall to L13 Aeration basin foundation

G02. Raw water suppley tank erection

G05. Demin plant erection 

G05. Demin plant erection

G07. Demin water storage tank erection


G08. Compressed air building

G17. Auxiliary boiler erection

G16.. Waste water Treatment plant

G17. Auxilary boiler installation


G17. Auxiliary boiler installation, view from South


G20. Potable water storage tank erection


G20. Industrial water pump station


H03. Pipe rack installation near Damin plant




L10. Booster fan installation

L13. Aeration basin

L40. FGD Measuring pit foundation work