Sunday 17 August 2014

17.08.2014 - Power Block Area

Power  Block general view from North


B01. Boiler area Hot and Cool air duct erection

B01. Boiler & Pressure parts erection

B01. Boiler erection, view from Bottom

B01. Boiler rear side duct erection



B01. Boiler pressure parts erection

B01. Boiler steel structure and Aird duct erection,
view from South






B01. Boiler Hot and cool Air duct erection, south side

B01. Boiler steel structure general view from West

B02. Chimney Flue duct liner can erection



B06. Bunker bay area pulverizer erection, veiw from North

B06. Bunker bay area pulverizer erection, view from South


B07. Fabric filter casing erection

B17. Boiler flue gas duct and steel structure ereciton

L10. Booster fan erection

B33. Unit Electrical building plastering work, view from East

B33. Unit electrical building Switch gear panel Lifting

B33. Unit electrical building auxiliary transformer

B33. Unit electrical building ground floor cable tray erection

B33. Unit electrical building 2nd floor

B33. 3rd floor


B33. Unit electrical building plastering, view from North


B35. Boiler electrical building ground floor cable tray erection

B35. Boiler electrical building Panel installation

B35. Boiler electrical building switch gear and panel installation

B63. Cooling water outlet pipe installation

B63. STG Table  concrete




B63. Turbine hall table concrete, general view from North

B63. Turbine hall North side pile cape preparation



B63. Turbine hall, steel structre and Mechanical erection
General view from North


B63. Turbine hall 16m lvl HP Heater & Desuper heater installation


B63. Turbine hall 11m lvl

B63. Turbine hall steel structure erection, general view from South

B63. Turbine hall Feed water pump and motor alignment

B63. Turbine hall big bore pipeing erection

B63. Turbine hall condenser neck installation

B63. Turbine hall cooling water pump and pipe connection


B68. Auxiliary transform installation

B68. Auxiliary transformer installation

B68. Main transformer installation


B68. Auxiliary transformer overview

C03_30 Light fuel oil pump station

C05. Crusher house

C40. Light fuel oil storage tank erection


C72. Electrical building insdie

C72. Electrical building

D01. Ash storage tank erection

E05. Cooling water underground pipeing sleeper foundation


E50. Outfall culvert Turbine hall to Aerattion basin

F06. Cable way foundation

G02 Rawwater supply tank erection


G05. Demin plant erection




G05. Demin plant steel structure & Plant erection



G07. Potable water storage tank erection



G08. Air compressed building

G17. Auxiliary boiler installation


G20. Potable water storage tank erection



G25. Water pump station




G28. Oil & fire fighting water recovery pit


H03. Pipe reack near Demin tank

L05. Absorber sheel roof concrete

Booster fan erection


L13. Aeration basin

L13 Aeration basine pipeing erection

No comments:

Post a Comment

Note: only a member of this blog may post a comment.