Tuesday 2 September 2014

02.09.2014 - Power Block area

Power Block area
B01. Boiler Hot & Cool Air Duct erection

B01. Boiler erection

B01. Boilere pressure parts erection


B01. Boiler roof steel structure, Hot and Cool air duct erection

B01. Duct erection, general view from South

B01. Boiler steel structure view from West

B02. Chiminey Flue Liner duct erecction

B63. Turbine hall, civil and mechanical work
view from North


B06. Pulerviser erection

Turbine table

B63. Turbine hall North - Civil Slab concrete  steel rebar installation

B63. Turbine hall general view from North

B06. Pulverizer erection, view from South

B17. Flue gas duct assembly & erection

B07. Fabric filter casing erection, view from West

B17. Flue gas duct and steel structure erection

B33. Unit electrical building ground floor, fire figthting work,
 cable tray erection

B33. Unit electrical building, cable pulling

B33. Unit electrical building ground floor cable pulling

B33. Auxiliary transformer


B33. 1st floor Panel board installation

B33. Switch gear panel installation

B33. 1st floor Switch gear panel installation



B33. Switch gear panel installation



B33. 2nd floor - Switch gear panel installation

B33. 2nd floor Fire fighting work

 
B33. Cable pulling


B33. Unit electical building Plastering work

B35. Boiler electrical building, view from South

B35, Auxilary transformer

B63. Turbine hall overhead crane



B63. Turbine hall 16 m lvl

B63. Large bore pipe erection







B63. Turbine hall ground floor

B63. Turbine hall steel structure, general view from South



B68. Main transformer erection

B68. Auxiliary transformer erection

C03_30 Fuel oil pump station area

C05. Crusher house

C40. Fuel oil stroage tank erection


D01. Ash storage structure

E05. Cooling water underground piping sleeper foundation

E50. Outfal Culver foundation Turbine hall to Aeration

F06. Cable way foundation, cable way rack

G02. Row water supply storage tank erection

G05. Demin plant steel structure erection

G05. Demin plant equipment erection

G07. Demin water stroage tank erection

G08. Compressed air Building, compresser equipment at site


G17. Auxiliary boiler installation



G25. Water pump station & G02 Tank erection

B01. Air pre heater erection


H01. Pipe rack erection

L10. Booster fan area

L05. Absorber and FGD Duct foundation