Monday 15 September 2014

14.09.2014 - Power Block

B01. Boiler area general view from North


B01. Boiler erection

B01. Boiler and pressure parts erection

B01. Boiler duct & steel structure erection



B01. Preheater erection

B01. Boiler area general view from West

B06. Bunker bay area pulverizer erection

B06. Bunker area Pulverizer erection, view from South

B07. Fabric filter casing erection


B17. Flue gas duct and steel structure erection

B17. Booster fan area


B33. Unit electric building, MV/LV cable pulling

B33. 1st floor, MV panel erection

B33. Ground floor MV/LV cable pulling




B33. LV panel erection



B68. Auxiliary transformer erection

B33. Unit electric building, plastering and painting,
view from South


B35. Boiler electric building, cable pulling

B35. Boiler electrical building panel erection

B35. Auxiliary transformer erection


B63. Turbine hall general view from North, slab concrete


B63. Turbine hall general view from North,
Civil and mechanical erection

B63. Slab concrete

B63. -0 level  slab concrete work

B63. - 5.2 m lvl Heat exchanger erection


B63. - 5.2 Feed water cooling pump

B63. Main cooling water inlet pipe

B63. - 0 level Cable tray erection






B63. Ground floor Feed water pump and motor alignment

B63. Cooling water out let pipe

B63. Condenser neck erection

B63. Large bore pipe erection



B68. Main transformer erection

C03_30 Fuel oil pump foundation area

C05. Crusher house area

D01. Ash storage structure

E05. Cooling water underground pipe erection

E50. Outfal culver Turbine hall to Aeration basine

F06. Cabe way foundation, steel support erection

G02. Raw water supply storage tank

G05. Demin plantation equipment erection

G07.  Potable water stroage tank erection

G05. Demin plant steel structure erection

G08. Air compresser building

G16. Waste water treatment plant


G17. Auxiliary boiler erection

G17. Auxiliary boiler erection overall view


G25. Water pump station building




H03. Pipe rack

G28. water recovery pit

L13. Aeration basine piping erection


L13 Aeration chanel, GRP header and pipe installation

C40. Fuel oil stroage tank erection


L43. Absorber supply and discharge piping foundation

No comments:

Post a Comment

Note: only a member of this blog may post a comment.