Thursday 20 November 2014

21.11.2014 - Power Block area progress


Plant general - Power block
20-Nov-2014

B01. Boiler duct and Air preheater erection


B01. Boiler area general view from North

B01. Boiler erection, furnance wall and bottom


B01. Boiler & duct erection




B01. Boiler Air preheater erection


B06. Funker bay area, pulverizer erection

B07. Fabric filter area 

B07. Fabric filter casing and equipment erection

B17. FGD flue gas duct and steel structre erection


B33. Unit electrical building, panel cable pulling and termination


B33. Panel cable termination

B33. commissioning work


B33. Unit electrical building, Controll room

B33. Cable pulling and termination

B33. Roof HVC work and floor

B63. Turbine hall - polish plant general veiw from West


B63. Turbine hall general view from North

B63. Turbine hall large bore piping erection



B63. Turbine hall - Condenser moduel erection

B63. Turbine hall equipment erection

B63. Turbine hall - large pipe erection



B63. Turbine hall generator


B63. Turbine hall feed water tank positioning

B63. Turbine hall - Generator and Air heater tank

B68. Main transformer and Auxilary transforer - view from B33

C73. Electrical building area, coal handling system erection



C05. Crusher house and roof steel structure erection

C40. Light fuel oil tank erection


F06. HV cable pulling



G02. Raw water storage tank erection &
G25. Water pump house


G05. Demin plant equipment and steel  structure erection

G08. Air compressor building equipment and
H03. Pipe rack erection

G17. Auxiliary boiler equipment and steel structure erection


E50. Outfall Turbine hall to areation basin

L13. Aeration basin area