Friday 7 November 2014

07.11.2014 - Power block

B01. Lifting to site - condenser part

B01. Boiler Furnace wall area


B01. Air preheater erection

B01. Wind bow duct erection

B01. Boiler area general view from South


B01. Boiler duct erection, view from South


B02, Bunker bay area, pulversizer erection, view from North

B07. Fabric filter casing ereciton

L10. Booster fan area, steel structure and duct erection

B33. Unit electrical building 

B63. Turbine hall steel structure and equipment erection

B63. Polish plant area

B63. Turbine hall area, general view from South

B68. Auxiliary transfomer area

B63. Polish plant area eequipment erection

B63. Turbine hall, large bore pipe erection

C30. Fuel oil unloading area

C40. Fuel oil stroage tank erection


E05. Cooling water under ground piping foundation work

E50. Turbine hall to Aeration basin area - Outfall work

F06. HV cable pulling


Demin plant erection

G17. Auxiliary boiler erection

No comments:

Post a Comment

Note: only a member of this blog may post a comment.