Wednesday 26 November 2014

26.11.2014 - Power block



Power block area

B63. Turbine hall area - IPB pipe erecton

B63. Turbine hall.IPB pipe erection


B33. Unit transformer Roof area



B63. Turbine hall - feed water tank erection

B63, Turbine Hall








B63. Turbine hall - generator area



B63. Turbine hall - heater's erection

B63. Heater erection

B63. Turbine hall - -05. level

B63. LP heaters piping erection





B63. Ground floor piping erection


B63. Condenser module in position

B63. CCCW cooling water pump and piping erection

B63. .-5 level - cable tray erection

B63. .-5 level equipment erection

B63. Booster pump and GRP pipe erection

B68. Auxiliary transfomer area IPB pipe erection


B68. Auxiliary Transformer and HV Cable erection

E50.. Outfall Turbine hall to Aeration basin

G05. Demin plant, H03 & G08 Air compressor building


G16. Waste water treatment - civil work



Auxiliary boiler erection work

No comments:

Post a Comment

Note: only a member of this blog may post a comment.