Tuesday 16 July 2013

16.07.13

B01.Bunker Bay foundation South Side
Applying water proof painting

                                         B01. Bunker Bay Strengthning work - South side 

B01. Bunker Bay Strengthning work - North side
Steel fixing for concrete

B01 - Bunker Bay North side - 
Rebar installation started


                                                        B01 - Boiler foundation Pedestal
                                                            backing filling F8 & F10


                                          B01- Boiler Foundation Connection Beam
                                                            strenghtning work 


                                               B01. Boiler Foundation Connection Beam
                                                strengthning work  - Vew from North side

                                         B01. Boiler Foundation Connection Beam Concrete -
                                                            View from North side     

B01 - Boiler foundation Backing filling
 Pedestal F8&10

B01. Boiler FD Fan Rebar installation work

                                          B35.  Boiler Electrical Building foundation work.


                                                    B94. Air preheaters washing Basin
                                                                     Piling work








                                          B01. Boiler foundation Connection Beam &
                                                          PA Fan foundation


                                                   B63. Turbain Hall Foundation work -
                                                   Bore piling work, view from North          
 

                       
                                          B33. Boiler Electrical Building ground floor work
                                                                   view from East


                                         B68. Transformer Foundation concrete

                                     
                                         C06 - Coal Conveyor between C05 & C07 (TT23)


                                          B02 - Chimeny - Foundation Finishing work

                                         B17 - Flue Gas Duct Foundation work - Steel fixing
 

                                         L05 - FGD Absorber - Pile Cap preparation


                                            C40. Light Fuel Oil Storage - Piling work


                                       B63. Turbain Hall Foundation work - View from north

                                         B63. Turbain Hall - East side piling work

                                                B63. Turbain Hall - North side, Bore piling



                                          B63. Turbain Hall- view from South, Piling work



No comments:

Post a Comment

Note: only a member of this blog may post a comment.