Wednesday 17 July 2013

17.07.13


B06. Bunker Bay foundation South Side
Applying water proof painting

                                        B06. Bunker Bay Stengthning work - North side
                                                   steel fixing for concrete       

B06. Bunker Bay North side - Rebar installation 

                               B01. Boiler Foundation concection beam concrete-
                                       Backfilling, view from North side 

                                B01. Boiler Foundation concection beam concrete-
                                        Backfilling, view from South side 

                                 B01. Boiler Foundation connection beam,
                                 strengthning work - View from North side


                                B01. Boiler Foundation connection beam,
                                strengthning work - View from South side

                              
                                  B01. Boiler FD Fan Rebar installation work 

                                 B63. Turbain Hall North side. Bore piling work 

B63. Turbain Hall North side. Bore piling 

B63. Turbain Hall. South side piling work

B63. Turbain Hall. East Side, view from South

                                       B33. Boiler Electrical Building,
                                       Ground floor reinforcement work

                                       B02. Chimney. Foundation back filling

                              L10. Booster Fan Foundation reinforcement work

                                B94. Air Preheaters Washing Basin
                                        Pile cap preparation

                                 B17 - Flue Gas duct foundation
                                          reinforcement work

D01 - Ash Storage - Bore piling work 

                                 L05 - FGD Absorber - Pile cap preparation


                                    C40. Light Fuel Oil Storage - Piling work 
                                      
 
                                  Boiler Duct preassembling - Inside the plant


                                     Ash Silo - Preassembly in side the plant


F01 - Switchyard 2ASlab Work 


F01. Switchyard 3A Slab reinforcement work

C04 - Coal Yard Soil filling - view from North

No comments:

Post a Comment

Note: only a member of this blog may post a comment.